American Cooperative School of Tunis

A Building of 8.000 m²

The Works carried out:

  • Transformation Stations;
  • Generators ;
  • Low Voltage Distribution;
  • Electrical Cabinets ;
  • Lighting and Sockets;
  • Telephony and IT Networks;
  • Fire detection ;
  • Building Management System.
img1
img1
img1
img1